Branches


Mafraq Branch

The has been big since the very beginning despite the limited abilities then a series of meetings for Mafraq engineers leading to forming the first Center Committee in 1985 and electing the first Branch Committee in 1986.

The major concern of the Branch is to provide the highest level possible of service and to take the fellow engineers and the profession to the next level.

The Branch started to develop albeit slowly due to the limited number of engineers at that time. However, with the increase in the number of engineers in the Governorate and the increase in the bond of the engineers and their interests with their Association, it became necessary to proceed with the development, as the Branch went through several stages such as:

  • The approval of offices for the Branch at the Professional Associations Complex in Mafraq City.
  • The equipment of a technical section to review and approve the engineering drawings.
  • The move and rent of a new and detached building, which was fully furnished and equipped.
  • The appointment of financial and administrative personnel for the purpose of taking the service to the next level.
  • The commencement of giving specialized engineering courses.
  • The expansion in the fields of the Branch business through the personnel and the equipment of the Engineers Training Center.

After the acquisition of the plot of land allocated for the Professional Associations Complex in 2003, there was a serious attempt to start building. In 2010, the Engineers Association in Mafraq was assigned to manage the construction project of the Associations Complex and to start making the procedures.

In the beginning, the engineering drawings of the Complex were prepared in 2011, and the structure works of the Complex constructions were commenced in 2011. The building is located on a four-dunam plot of land in Hai Al Husban. It is a two-story building, and the ground floor is the Professional Association Complex building with an area of 1100 square meters. It includes a meeting room, activity room, offices for all associations and a basement for services. The entire upper floor is for the Engineers Association consisting of offices, a meeting room, activity room and the Engineers Training Center.

After a constant effort and intensive follow up made by the Branch Council and a constant support provided by the Association Council and the General Secretariat, the dream finally came true and the building was constructed.

The building consists of the following sections:

Technical Section:

Its purpose is to review the engineering drawings sent to the engineering offices operating in the Governorate.

Financial & Administrative Section:

It has the following duties:

  • To receive the annual subscriptions and Pension Fund revenues.
  • To receive the installments of lands, cars, furniture and apartments.
  • To facilitate the fellow engineers subscription to the Solidarity, Pension and Health Insurance Funds; and to receive the marriage loans engineers’ children education loans. 95% of the investment and service funds transactions are supposed to be completed in order to save the fellow engineers the burden of travelling to Amman.

 Engineers Training Center

The Center trains the engineers and presents all specialized courses.

Activity Hall

Meeting Room

The Engineers Association Branch Council of Mafraq Governorate, which has around 1400 fellow engineers as members, organizes numerous scientific and social activities. The Branch Council played a key role in the activation of the social aspect of the engineers and their families and children through organizing a number of social activities. The Branch annually organizes family picnics for engineers within Jordan and abroad, as well as Umrah trips.

Summer Club

The Branch held several summer clubs for engineers’ children over the past years, and they included courses in swimming, taekwondo, computer, football and Quran contests. It also included a fitness course for engineers as an annual sport activity for engineers.

A ceremony was held for honoring Mafraq Branch former members and heads, and it was sponsored by Mafraq Governor.

To hold scientific workshops and cultural contests, as well as sport contests.

To approve the polls of the Association Council and Engineering Divisions at the Branch Offices.

In interaction with the local community, the Branch annually distributes food packages and school bags to the needy. The Engineers Association also completed the Engineer Street in Mafraq in cooperation Greater Mafraq Municipality, and the Branch holds numerous seminars.

The Branch meets the Engineering Departments Directors in the Government on a yearly basis.

Female Engineers Committee

A Committee on Female Engineers was formed in the Branch, and it organizes numerous activities, courses, meetings and picnics every year.

Young Engineers & Employment Committee

A Committee on Young Engineers & Employment was formed in the Branch. It organized many workshops concerning the self-development and creativity. It also held scientific training courses benefiting a lot of new engineers and it made scientific visits and social picnics.

Conclusion

Here is our Association shining in the sky of precious Nation sparing no effort to provide all services to its affiliates and local community. All this was achieved thanks to the efforts of its loyal members who held the honor of accountability to raise their Association and Nation.